Today we had our contract
presentation appointment. We received the contract just one day before, so didn't have much time to read through it fully. We sent to our solicitor immediately and
he let us know the contract is ok to
sign. But on the site plans we found some errors which are being fixed on the contract
presentation day. We made a note for all the questions that we got before the contract
appointment. The tender and the contract presenter was the same person. So it
was quite easier to consult with her. After she finished her contract
presentation we raised the below issues.
·
No indication where would be the
hot water system – She draws the hotwater system next to meter area (behind the
living room).
·
A window between alfresco and dining
which we were not aware of, as all the display homes we went had stacker door
between the alfresco and dining which makes it look more open. So we asked a quote
for sliding door and stacker door. The quote for sliding door was around $590
and for stacker door $1850. After little bit negotiation we decided to have
stacker door, as we wants to have the same door that we are getting on our
family room. So the final price for stacker door is $1600.
·
We asked for a fixed window on
the dining area instead of sliding window on our tender appointment but they
didn’t change that. After notifying her, she removes the sliding window and includes
a fixed window on the dining area.
·
We didn’t like the 3rd bedroom
window height, so we asked her if we can increase the height and she gave us a
quote for $215. After negotiation she gave us the final price $100 to
increasing the height which we agreed to pay.
And we signed the contract :)